Re: NCIH Maintenance
Network Operations (trouble@ncren.net)
Sun, 9 May 1999 11:43:10 -0400 (EDT)
Fujitsu is still working with the Winston-Salem FETEX ATM switch.
There is a possibility that a phase D(full reset) will have to
be done sometime today. In that case, a short outage will occur.
We apologize for any inconvenience.
Thanks,
Daniel