Date of work: 11/5/04
Start time: 3:00 am
End time: 6:00 am
Location(s): MCNC
Description of work to be performed:
Level 3 engineers will put MCNC traffic onto a new uplink in Raleigh.
All configuration changes will be made on the Level 3 side. The
connection is not expected to be down the entire maintenance window.
Sites that will be affected are:
No outage is expected. This is a work advisory.
If you have any question or concerns please let us know (919)-248-1111.
Thanks
Ray Suitte
NCREN NOC