Date of Work: 04/15/2007
Start Time: 12:01 am
End Time: 1:00 am
RPoP(s): RTP/MCNC,
Locations Affected:
RTP/MCNC *
Description of work to be performed:
On April 15, NCREN engineers will be moving our 10 gig connection to NLR into a layer 2 switch we have installed at Level3/Departure Dr. This work will effect our connections to NLR (Atlanta and Washington DC) and SOX. Work will start at 12:01 am and should be completed by 1:00 am. While we don't anticipate the connections being down the entire maintenance window, the entire window is reserved. This work will not effect our commodity connections to Level3.
If you have any questions please contact us at 919-248-1111 or trouble@ncren.net
_______________________________________________
Net-info mailing list
Net-info@list.mcnc.org
https://list.mcnc.org/mailman/listinfo/net-info
Received on Tue Apr 10 13:52:17 2007
This archive was generated by hypermail 2.1.8 : 04/10/07 EDT